Eurotech Global Project’s

NOBLE SAM HARTLEY – Invergordon
Electrical Major Shipyard contractor installing various Electrical Systems,
  • Mud Logging System
  • Fibre Network System
  • Structured cabling
  • Upgraded Power supplies
  • MPD
  • Accommodation Works
  • Ex Survey
  • Sockets Upgrade
  • AMOT Valve Installation
  • Platform interface
  • Lighting Upgrades
  • Heli Fuel System
  • Fire and Gas Mods
  • Drag Chain installation
  • Maintenance Assistance
STENA SPEY – Bergen
Electrical Shipyard contractor installing various Electrical Systems,
  • CCTV System
  • BOP Control System
  • Ex Survey
  • Ex Repairs
  • Maintenance Assistance
STENA FORTH – Las Palmas
Electrical Shipyard contractor 
  • MPD System
SEAWELL – North Sea
Electrical contractor 
  • CCTV Installation
Culzean – North Sea
Electrical contractor 
  • Fibre Optic testing and terminating
Ocean Guardian – North Sea
Electrical contractor 
  • Structured Data cable installation
Transocean Leader – North Sea
Electrical contractor 
  • Fibre cable installation, termination and test
Maersk Gryphon – North Sea
Electrical contractor 
  • Fibre cable installation, termination and test
COSL pioneer – North Sea
Electrical contractor 
  • Slip Ring change out
  • Rig Maintenance
West Hercules – Norway
Electrical contractor 
  • Ex Works
  • Cuttings install
  • Rig Assistance
  • Trace heating/Winterisation system
Noble Hans Deul – North Sea
Electrical contractor 
  • Ex Works
Shelf Drilling – Trident 8
Electrical contractor 
  • SCR Health Checks and repairs
  • Jacking system repairs
  • Top drive mods
4ms – Aberdeen
Electrical contractor 
  • Office fit out
Total Elgin – Aberdeen
Electrical contractor 
  • Rig Interface
Houlder – Aberdeen
Electrical contractor 
  • Project Support
Skills

Posted on

October 15, 2018

Submit a Comment

Your email address will not be published. Required fields are marked *